Export limit exceeded: 430281 CVEs match your query. Please refine your search to export 10,000 CVEs or fewer.

Export limit exceeded: 430281 CVEs match your query. Please refine your search to export 10,000 CVEs or fewer.

Search

Search Results (4 CVEs found)

CVE Vendors Products Updated CVSS v3.1
CVE-2001-1314 1 Critical Path 2 Injoin Directory Server, Livecontent Directory 2026-04-16 N/A
Buffer overflows in Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code, as demonstrated by the PROTOS LDAPv3 test suite.
CVE-2001-1315 1 Critical Path 2 Injoin Directory Server, Livecontent Directory 2026-04-16 N/A
Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code via malformed BER encodings, as demonstrated by the PROTOS LDAPv3 test suite.
CVE-2002-0786 1 Critical Path 1 Injoin Directory Server 2026-04-16 N/A
iCon administrative web server for Critical Path inJoin Directory Server 4.0 allows authenticated inJoin administrators to read arbitrary files by specifying the target file in the LOG parameter.
CVE-2002-0787 1 Critical Path 1 Injoin Directory Server 2026-04-16 N/A
Cross-site scripting vulnerabilities in iCon administrative web server for Critical Path inJoin Directory Server 4.0 allow remote attackers to execute script as the administrator via administrator URLs with modified (1) LOCID or (2) OC parameters.